School boiler house refurbishment undertaken during 2020. A temporary boiler plant was supplied and installed to maintain services during the works. The existing atmospheric natural gas boilers, hot water cylinders and control panel were removed and 4 new condensing modulating boilers were installed with a combined total output of 480kW. The boilers were installed on freestanding frames and the pipework modified to incorporate a low loss header. New DHW cylinders were installed with integral plate heat exchangers and new BMS controls installed with facility for remote monitoring.